Sustainability and Community Benefits

High-speed rail delivers benefits at every station along the Phase 1 corridor — faster access to jobs, safer street crossings, local investment and restored open space. Select a station on the map to see what the project means there.

Total Project Benefits to Date

 

 9999 jobs

 Construction Jobs

 

 45,454 trees

 Trees planted

 

 3,000,000 $

 Capital investment

 

 845 acres

 Wetlands restored

 

 77 crossings

 Grade separations

 

 75 units

 Housing units

Phase 1 corridor – San Francisco to Anaheim

San Francisco

Salesforce Transit Center

 

The San Francisco terminus at the Salesforce Transit Center is reached via the Downtown Rail Extension. Until that extension opens, service terminates at Fourth and King Street.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Millbrae

Caltrain / BART

Millbrae is a blended-system stop on the Caltrain corridor, offering a direct BART connection to San Francisco International Airport and the East Bay.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

San Jose

Diridon Station

San José Diridon Station is the principal Bay Area interchange, combining high-speed rail with Caltrain, ACE, Capitol Corridor, VTA light rail and a planned BART extension.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Gilroy

Downtown

Gilroy is the southernmost Bay Area station and the gateway between the Bay Area and the Central Valley via the Pacheco Pass tunnels.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Merced

IOS northern terminus

Merced Station is the northern terminus of the Initial Operating Segment and the principal multi-modal gateway to the northern San Joaquin Valley, with an elevated walkway connecting to the regional bus depot.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Madera

Madera County

The Madera County station is planned in coordination with the San Joaquin Joint Powers Authority, integrating high-speed rail with existing San Joaquins service.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Fresno

Downtown / Chinatown

Fresno Station will sit downtown between Tulare and Fresno Streets, reconnecting downtown with historic Chinatown across a rail corridor that has divided them for over a century. It is the only Central Valley station designed at grade.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Kings/Tulare

Regional Station

The Kings/Tulare Regional Station sits east of Hanford on the BNSF alignment, serving as the regional gateway for the southern San Joaquin Valley and the Sequoia gateway communities.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Bakersfield

F Street, downtown

Bakersfield Station on F Street is the southern terminus of the Merced–Bakersfield Initial Operating Segment. City advocacy placed the station downtown rather than on the periphery, supporting transit-oriented redevelopment.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Palmdale

High Desert interchange

Palmdale Station serves the Antelope Valley and is planned as an interchange with Brightline West and the High Desert Corridor, extending the network toward Las Vegas.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Burbank

Hollywood Burbank Airport

The Burbank Airport Station provides direct high-speed rail access to Hollywood Burbank Airport and the San Fernando Valley.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Los Angeles

Union Station

Los Angeles Union Station is being reconfigured from a stub-end terminal into a run-through station through the Link US project, adding dedicated high-speed rail platforms.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Anaheim

ARTIC

The Anaheim Regional Transportation Intermodal Center is the Phase 1 southern terminus, serving Orange County and the Anaheim resort and stadium districts.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

San Francisco

Salesforce Transit Center

The San Francisco terminus at the Salesforce Transit Center is reached via the Downtown Rail Extension. Until that extension opens, service terminates at Fourth and King Street.

 

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Millbrae

Caltrain / BART

Millbrae is a blended-system stop on the Caltrain corridor, offering a direct BART connection to San Francisco International Airport and the East Bay.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

San Jose

Diridon Station

San José Diridon Station is the principal Bay Area interchange, combining high-speed rail with Caltrain, ACE, Capitol Corridor, VTA light rail and a planned BART extension.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Gilroy

Downtown

Gilroy is the southernmost Bay Area station and the gateway between the Bay Area and the Central Valley via the Pacheco Pass tunnels.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Merced

IOS northern terminus

Merced Station is the northern terminus of the Initial Operating Segment and the principal multi-modal gateway to the northern San Joaquin Valley, with an elevated walkway connecting to the regional bus depot.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Madera

Madera County

The Madera County station is planned in coordination with the San Joaquin Joint Powers Authority, integrating high-speed rail with existing San Joaquins service.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Fresno

Downtown / Chinatown

Fresno Station will sit downtown between Tulare and Fresno Streets, reconnecting downtown with historic Chinatown across a rail corridor that has divided them for over a century. It is the only Central Valley station designed at grade.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Kings/Tulare

Regional Station

The Kings/Tulare Regional Station sits east of Hanford on the BNSF alignment, serving as the regional gateway for the southern San Joaquin Valley and the Sequoia gateway communities.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Bakersfield

F Street, downtown

Bakersfield Station on F Street is the southern terminus of the Merced–Bakersfield Initial Operating Segment. City advocacy placed the station downtown rather than on the periphery, supporting transit-oriented redevelopment.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Palmdale

High Desert interchange

Palmdale Station serves the Antelope Valley and is planned as an interchange with Brightline West and the High Desert Corridor, extending the network toward Las Vegas.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Burbank

Hollywood Burbank Airport

The Burbank Airport Station provides direct high-speed rail access to Hollywood Burbank Airport and the San Fernando Valley.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Los Angeles

Union Station

Los Angeles Union Station is being reconfigured from a stub-end terminal into a run-through station through the Link US project, adding dedicated high-speed rail platforms.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

Anaheim

ARTIC

The Anaheim Regional Transportation Intermodal Center is the Phase 1 southern terminus, serving Orange County and the Anaheim resort and stadium districts.

ACCESS & CONNECTIVITY


30 min 40 min 456 jobs 25 services
Travel time to San Francisco Travel time to Los Angeles Jobs reachable within 60 min Connecting transit Services

 

LOCAL MOBILITY & SAFETY


15 crossings 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ECONOMIC INVESTMENT


50 jobs 1 hrs/day 5 crossings  
New grade seperations Daily driver-hours saved At-grade crossings removed  

 

ENVIRONMENT


2500 trees 199 acres 222 acres  
Trees planted Wetlands restored Open space restored  

 

GRADE SEPERATIONS IN THIS AREA

Peninsula corridor seperations — see SF — San Jose EIR/EIS Planned

 

GRADE SEPERATIONS IN THIS AREA

  • Caltrain corridor electrification, co-funded by the Authority, is complete.
  • Blended operation shares the Peninsula corridor
  • Direct interchange with Muni Metro, BART, regional buses and ferry services.

LEARN MORE

San Francisco station community page

9999 jobs

Construction Jobs

3,000,000 $

Capital investment

77 crossings

Grade seperations

45,454 trees

Trees planted

845 acres

Wetlands restored

845 acres

Wetlands restored

The California High-Speed Rail Authority makes every effort to ensure the website and its contents meet mandated ADA requirements as per the California State mandated Web Content Accessibility Guidelines 2.0 Level AA standard. If you are looking for a particular document not located on the California High-Speed Rail Authority website, you may make a request for the document under the Public Records Act through the Public Records Act page. If you have any questions about the website or its contents, please contact the Authority at info@hsr.ca.gov.