CEO- ի հաշվետվությունը
16 մայիսի, 2024 թ
HSR 2024 Milestones | Newly Submitted Grant Applications | Central Valley Station Open Houses | Small Business/Procurement Outreach Event | Brightline West Groundbreaking |Համապատասխան նյութեր |
HSR 2024 MILESTONES
Goals to complete this year
- Project Delivery
- Surpass 14k construction jobs
- Achieve construction project milestones
- Stations
- Complete schematic designs for Central Valley Stations by Q3
- Complete Fresno Historic Depot design
- Complete Fresno Plaza design
- Rail Operations/Procurements
- Release RFP and award contract for trainsets
- Award contract for Track and Systems design
- Conduct Industry Forum
- Դատավարություն
- Work toward settlement on existing CEQA litigation (Brisbane, Baylands Development, Inc.)
- Federal Partnership
- Apply for nine federal grants
- Complete renewal of NEPA assignment
- Obligate all grant awards from 2023.
- Project Controls/Risk
- Update master schedule for 171-mile early operating segment
- Complete cost review for Palmdale to Burbank Section
- Strategic Delivery
- Get to 30% design for Bakersfield and Merced extensions
- Begin right-of-way acquisitions for Bakersfield and Merced extensions
- Certify environmental documents for Palmdale to Burbank segment
- Issue draft EIR/EIS for Los Angeles to Anaheim segment
- Strategic Communications
- Complete exhibit for California State Fair (July 2024)
NEWLY SUBMITTED GRANT APPLICATIONS
- Ամերիկյան ենթակառուցվածքների վերականգնում կայունությամբ և հավասարությամբ (RAISE)
- Merced integrated station work
- RAISE Program Eligibility and Purpose:
- Ներդրումներ կատարեք ճանապարհների, երկաթուղային, տարանցիկ և նավահանգստային նախագծերում՝ ազգային նպատակներին հասնելու համար:
- Դիմումի ակնարկ.
- The Project is the Final Design phase of the Merced Integrated Multimodal Station (Project). The Merced Station will be designed to maximize seamless multimodal opportunities. It will serve passenger needs more effectively and increase rail and bus ridership.
- The station design will include: canopies and platforms; elevators, escalators and concourses; electric vehicle charging; and parking and drop-off areas.
- Լրացուցիչ տեղեկություն:
- Grant request of about $16 million, matched with about $4 million.
- 2024 Grant Application Submitted February 28, 2024
- Grid Resilience and Innovation Program (GRIP)
- Electric power transmission
- GRIP Program Eligibility and Purpose:
- Supports innovation for electric power transmission and distribution capacity and resiliency.
- Դիմումի ակնարկ.
- The Authority’s Project will deploy and demonstrate an innovative and grid-optimal energy system. The Project will deploy behind-the-meter solar photovoltaic energy generation to serve four Traction Power Substations and a battery energy storage system.
- These Microgrid systems will power High-Speed Rail and can reduce peak demands and energy intensity on the transmission grid and enable community resilience to members of the district and adjacent communities.
- Լրացուցիչ տեղեկություն:
- HSR submitted a concept paper to US DOE and was encouraged to apply in 2024.
- Grant request of about $60.2 million, matched with about $60.2 million.
- Application Submitted April 12, 2024.
- National Infrastructure Project Assistance (Megaprojects)
- Merced integrated station work
- GRIP Program Eligibility and Purpose:
- Տարբեր տեսակի ենթակառուցվածքների լայն իրավասություն:
- Դիմումի ակնարկ.
- The application is for the Merced Integrated Multimodal Station (Project), a planned mobility hub in downtown Merced designed to maximize seamless multimodal opportunities.
- The Project will serve as a “Northern California Gateway” with services, including:
- High-Speed Rail to Fresno and Bakersfield with connections South;
- Amtrak’s San Joaquin service to Oakland and Sacramento;
- Altamont Commuter Express service to San José and Sacramento; and
- Interregional and Merced County Transit bus services, including to Yosemite National Park.
- Լրացուցիչ տեղեկություն:
- Grant request of about $236.1 million, matched with about $157.4 million.
- Application Submitted May 6, 2024.
CENTRAL VALLEY STATION OPEN HOUSES
Four open houses were held in:
- Բեյքերսֆիլդ
- Հենֆորդ
- Ֆրեզնո
- Բեյքերսֆիլդ
650+ people attended over four days
Earned media audience: 463 million clicks
Publicity value: 4.4 million
Feedback will continue to inform station design work
SMALL BUSINESS/PROCUREMENT OUTREACH EVENT
- 7 մայիսի, 2024 թ
- 180 participants
- 27 small businesses/firms set up tables for outreach
BRIGHTLINE WEST GROUNDBREAKING
See PowerPoint for photos from the event.
ՀԱՐEL ՆՅՈԹԵՐ
- Board Memo for May 2024 CEO Report.
- PowerPoint Presentation for May 2024 CEO Report.
- 2024 թվականի մայիսի գլխավոր գործադիր տնօրենի զեկույցի տեսանյութ (եթե առկա է)
Կալիֆոռնիայի գերարագ երկաթուղային մարմինը ջանք չի խնայում, որպեսզի վեբ-կայքը և դրա բովանդակությունը համապատասխանեն AՀԳ-ի մանդատների պահանջներին, համաձայն Կալիֆորնիայի նահանգի մոնտաժված վեբ բովանդակության հասանելիության ուղեցույցների 2.0 մակարդակի AA ստանդարտի: Եթե դուք փնտրում եք որոշակի փաստաթուղթ, որը չի գտնվում Կալիֆոռնիայի գերարագ երկաթուղային մարմնի կայքում, կարող եք փաստաթղթի վերաբերյալ պահանջ ներկայացնել «Հանրային գրառումների մասին» օրենքի ներքո ՝ «Հանրային գրառումների մասին» օրենքի էջի միջոցով: Եթե կայքի կամ դրա բովանդակության վերաբերյալ հարցեր ունեք, դիմեք Մարմնին ՝ info@hsr.ca.gov.